Annotations

  • A-09-02 - Aluminium louvre system (Built-in vent in windows / doors / curtain walls)

  • A-10-01 - Aluminium balustrade system

  • B-04-01 - PUR-aluminium window system (Inward opening side-hung window)

  • B-04-07 - PUR-aluminium window system (Fixed window)

  • D-05-01 - Stainless steel support bracket, fixed point

  • D-05-02 - Stainless steel support bracket, sliding point

  • D-06-01 - Stainless steel support bracket

  • E-03-01 - Stainless steel cast-in channel

  • E-03-02 - Stainless steel T-bolt (nut+washer)

  • F-02-01 - Aluminium rivet

  • G-01-01 - Lightweight structural steel framing system

  • G-02-01 - EPDM

  • G-02-03 - Vapour control layer (VCL)

  • G-04-01 - Mineral wool insulation (for wall) (k ≤ 0.035 W/mK)

  • G-04-02 - Mineral wool insulation (to LSF) (k ≤ 0.038 W/mK)

  • H-02-01 - Double glazed unit (DGU-1)

  • H-04-01 - Aluminium spandrel panel (ASP-1)

  • I-06-01 - Cast in brick tile

  • I-07-01 - Precast concrete panel

  • J-01-01 - Aluminium flushing (t-2mm)

  • J-02-01 - Aluminium sill (t-2mm)

  • J-05-01 - Aluminium sheet (t-2mm)

  • K-03-02 - Aluminium angle

  • L-01-01 - Internal wall finish

  • L-01-02 - Floor build up

  • L-01-03 - Ceiling build up

  • L-01-04 - Sill

  • M-01-02 - Horizontal fire barrier (close)

  • M-03-01 - Support bracket (fire)

  • N-01-01 - Silicone sealant (for external)

  • N-02-01 - Polyethylene foam backing

  • N-03-01 - Flush mortar

  • Z-01-01 - Concrete slab

  • Z-01-02 - Concrete column