Annotations
A-10-01 - Aluminium balustrade system
B-04-01 - PUR-aluminium window system (Inward opening side-hung window)
B-04-07 - PUR-aluminium window system (Fixed window)
C-01-01 - Aluminium support bracket
C-01-02 - Aluminium L-profile
C-07-01 - Stainless steel support bracket
C-07-02 - Stainless steel support angle
C-07-04 - Stainless steel ties
C-07-06 - Plain Channel for ties
C-07-07 - Compression Sleeves
C-07-08 - Reveal Support Plate
D-06-01 - Stainless steel support bracket
E-05-01 - Stainless steel anchor (bracket to concrete)
E-06-01 - Stainless steel screw (bracket to LSF)
E-07-01 - Stainless steel cast-in channel
E-07-02 - Stainless steel T-bolt (nut+washer)
F-01-01 - Stainless steel screw (small)
F-02-01 - Aluminium rivet
F-03-01 - Stainless steel screw (rail to bracket)
F-03-02 - Stainless steel screw (panel to rail)
F-05-01 - Frame anchor (fire)
F-08-01 - Stainless steel screw for concrete
G-01-01 - Lightweight structural steel framing system
G-02-01 - EPDM
G-02-02 - Breather membrane
G-02-03 - Vapour control layer (VCL)
G-02-04 - Non-combustible cavity tray
G-02-05 - Waterproofing membrane
G-03-01 - Non-combustible sheathing board (for SFS)
G-04-01 - Mineral wool insulation (for wall) (k ≤ 0.035 W/mK)
G-04-02 - Mineral wool insulation (to LSF) (k ≤ 0.038 W/mK)
G-04-03 - Mineral wool insulation (for slab edge) (ρ ≥ 100 kg/m^3)
H-02-01 - Double glazed unit (DGU-1)
I-01-01 - Aluminium panel (t-2mm)
I-05-01 - Brick
I-05-02 - Soffit unit
J-02-01 - Aluminium sill (t-2mm)
J-03-01 - Aluminium reveal (t-2mm)
K-01-04 - Aluminium angle
K-02-04 - Stainless steel C-profile
K-03-02 - Aluminium angle
L-01-01 - Internal wall finish
L-01-02 - Floor build up
L-01-03 - Ceiling build up
L-03-04 - RWP
L-03-05 - Balcony floor build up
M-01-01 - Horizontal fire barrier (open)
M-01-02 - Horizontal fire barrier (close)
M-02-01 - Vertical cavity closer
M-03-01 - Support bracket (fire)
N-01-01 - Silicone sealant (for external)
N-02-01 - Polyethylene foam backing (Rigid foam backing)
N-02-04 - Compressible filler
N-03-01 - Flush mortar
Y-01-01 - Holes for drainage and ventilation
Y-01-02 - Weep holes
Z-01-01 - Concrete slab
Z-01-02 - Concrete column
Z-01-04 - Concrete downstand